The drawing set is revised many times throughout the life of the project. It sometimes become tedious to maintain or/and observe change in each drawing revision. After each drawing revision, we overlay the drawings to observe changes and list down each and every change ultimately reducing project manager’s effort and time to review every drawing. The onsite team can also easily identify changes having cost impact on the item/project.